Record a change
Create a change in an MDA desk with its type, risk and planned window, and find it later in the change list views.
On this page
Record a change before modifying something that's in production: a server, a network, an application or a configuration. Creating it asks for the essentials to place it on the calendar; the plans are written later, in the record.
Before you start
The desk must be an IT help desk (MDA).
You need Operate in Changes and a desk role other than Viewer. If you don't have them, the New change button doesn't appear.
Be clear on the change type (see the table below) and, if you already know it, the window in which it will be done.
Steps
In the side menu, open Desks and choose the MDA desk.
Under the desk name, press Changes.
Press New change.
Fill in the window:
Field
What to enter
Title
Required, at least 3 characters. For example, "Update the firmware on the 3rd-floor switches".
Description
What changes and why. The plan, backout and tests go in the change record.
Type
Standard, Normal or Emergency. It defaults to Normal. Below it, a help text explains the chosen type.
Risk
High, Medium or Low. It defaults to Medium.
Planned window
Window start and Window end: the date and time when the change will be done.
Affected service
The service being worked on, or No service.
Group
The group that will carry out the change, or Automatic assignment.
Press Create change.
You'll see the message with the number (for example, CHG-000031 created) and the change record opens, in Draft status.
Which type to choose
Type | On-screen help | Use it for |
|---|---|---|
Standard | Pre-approved: low-risk and repeatable; doesn't go through the CAB. | Routine tasks with a proven procedure, like adding memory to a virtual machine. |
Normal | Goes through the CAB before being scheduled. | Most changes. |
Emergency | Urgent: approved by the emergency CAB. | Fixing something that's causing a serious incident right now. |
Window rules
The window is optional when creating the change, but it's required to send it to assessment (see Change plans).
If you enter the end, enter the start too. Otherwise you'll see Also enter the window start.
The end must be after the start. Otherwise you'll see The window end must be after the start.
Times are entered in your local time.
Before choosing the window, check the Change calendar so you don't overlap with another change on the same infrastructure.
Find a change
The Changes view has six tabs:
Tab | What it shows |
|---|---|
In progress | Everything that hasn't finished: from Draft to In review. It's the one that opens by default. |
Awaiting CAB | Changes in Awaiting CAB. |
Scheduled | Those in Scheduled and Implementing. |
In review | Those that finished implementation and are awaiting their review. |
Finished | Those in Closed, Rejected and Cancelled. |
All | All the desk's changes. |
To search, type in Search by number or title and press Enter. Each row shows Priority, Number, Title, Status, Group, Assignee and Updated; click the number or the title to open the record. If there are more results, press See more.
At the top right, Calendar opens the Change calendar. The list updates on its own; to force it, press Refresh.
The change record
The record is divided into sections:
Classification: Type, Risk and Impact.
Plans: Implementation plan, Backout plan and Test plan.
Window: Planned start, Planned end, Actual start and Actual end.
Post-implementation review: the change's Result.
Side panel: Status, Type, Risk, Priority, Group, Assignee, Service and the CAB section.
At the top are the status buttons, Calendar, which opens the month of the change window, and Conversation, which opens the general record with the conversation, attachments and SLA.
Every time you change something, press Save; you'll see the message Change saved. If someone else modified it while you were typing, Someone else changed this change while you were typing. appears with the See the latest (discards yours) button, which loads their version and discards yours.