Implement and review a change
Start the implementation of a scheduled change, record it as finished, note the result in the post-implementation review and close or cancel the change.
On this page
A Scheduled change already has the approval it needed. During the window, the person carrying it out marks in Elion ITSM when it starts and when it ends, and then records how it went. That way the full story is kept: what was planned, what was approved and what really happened.
Before you start
You need Operate in Changes and a desk role other than Viewer.
The change must be Scheduled. It reaches that state when the CAB approves it or, if it's Standard, as soon as approval is requested (see CAB approval). You don't have to press anything to schedule it.
Have the record's Implementation plan and Backout plan at hand.
Start implementation
Open the change record when the window begins.
Press Start implementation.
The change moves to Implementing and, in the Window section, the Actual start is set to the date and time of that moment.
If the window clashes with other changes
When the change window overlaps with another change that hasn't finished, the record warns you at the top with The window clashes with: and the number and title of each one. Click them to review them.
If you press Start implementation with clashes, Elion ITSM asks you first:
The The window clashes with other changes window appears with the text Check the calendar before starting. Start anyway?
If you've already coordinated with the people responsible for the other changes, press Start anyway. If not, close the window and check the Change calendar.
Two simultaneous changes on the same infrastructure make it hard to know which one caused a problem, and can get in each other's way when backing out. Starting anyway is possible, but do it knowing what you're clashing with.
Only changes you can see count as clashes. Closed, Rejected and Cancelled changes don't clash.
Finish and review
When you finish carrying out the plan (or backing out, if something failed), press Finish and review.
The change moves to In review and the Actual end is set to the date and time of that moment.
Actual start and Actual end are set automatically when implementation starts and ends. They aren't entered by hand, so press the buttons at the moment you actually start and finish.
Post-implementation review
With the change In review, the Post-implementation review section is enabled:
In Result, choose how the change went:
Result
When to choose it
Successful
What was planned was done and the tests went well.
Successful with issues
It was done, but with deviations or minor problems worth noting.
Failed
The change's goal wasn't achieved.
Backed out
The backout plan was applied and everything was left as before.
Press Save.
Until the change reaches In review, the field says Not reviewed and is locked, with the help text Filled in when the change reaches review.
Use Conversation to record the details of what happened: what deviations there were, what incidents were opened and what the team learned. If the change fixed a problem, note the change number in the problem's resolution (see Resolve and close a problem).
Close change
With the Result saved, press Close change.
The Close this change? window reminds you that It's a final state: it can't be edited afterwards.
Confirm with Close change.
If the result is empty, you'll see You still need to save the review result. and the change stays In review. If you chose it and didn't save it, Elion ITSM saves it before closing.
Cancel change
Use Cancel change when the change won't be done anymore: it was postponed with no date, it was replaced by another one, or something the CAB already approved needs to be modified.
Press Cancel change. It's available in any non-final state.
In the Cancel this change? window, confirm with Cancel change.
A cancelled change no longer appears on the calendar and frees up its window.
Final states
A Closed, Rejected or Cancelled change can no longer be edited: the status buttons disappear and the fields are locked. If work needs to continue, record a new change.