Change plans

Write the change's impact and its three plans in the change record: implementation, test and backout. Which ones are required before sending it to assessment.

On this page

A well-prepared change says what will be done step by step, how you'll check it went well and how it will be undone if something fails. That's the information the CAB reviews to approve it, and what the person carrying it out follows during the window.

Before you start

  • You need Operate in Changes and a desk role other than Viewer.

  • The change must be in Draft or In assessment. After that, the plans can no longer be modified (further down, in Until when they can be edited).

What to write in each field

The fields are in the change record, in the Classification and Plans sections.

Field

Section

What to write

Required for assessment?

Impact

Classification

Which services and people are affected during the window.

No

Implementation plan

Plans

The steps of the change, in order, with who does each one.

Yes

Backout plan

Plans

How to undo the change if something goes wrong, and at what point that's decided.

Yes

Test plan

Plans

How to check that the change worked: what's checked and what result is expected.

No

The full window is also required for assessment: Planned start and Planned end, in the Window section.

The impact allows up to 10,000 characters, and each plan up to 20,000.

Even though the test plan isn't required, the CAB usually asks for it. A change with no way to check it worked is hard to approve and to review afterwards.

Steps

  1. Open the change record from Changes.

  2. In Classification, check the Type and the Risk, and write the Impact.

  3. In Plans, write the Implementation plan, the Backout plan and the Test plan.

  4. In Window, fill in Planned start and Planned end.

  5. Press Save. You'll see the message Change saved.

If you change your mind before saving, press Discard and you go back to the last saved version.

Send to assessment

With the plans and the window ready:

  1. Press Send to assessment at the top. If there are unsaved changes, Elion ITSM saves them first.

  2. The change moves to In assessment.

If something is missing, the status doesn't change and you'll see what's missing, for example You still need to save the backout plan and the window (start and end).

For a Normal or Emergency change, reaching In assessment also starts the CAB approval workflow (see CAB approval).

Set the Type before pressing Send to assessment. The CAB workflow is chosen based on the type the change has at that moment.

Until when they can be edited

  • In Draft and In assessment you can change the type, risk, impact, plans and window.

  • From Awaiting CAB onwards, these fields are no longer saved: you'll see After requesting approval, the change's plan and window can't be edited. That way what the CAB approved is the same as what's carried out. If something needs to change, cancel the change and record a new one.

  • The post-implementation review Result is the exception: it's filled in when the change reaches In review (see Implement and review a change).

  • In a final state (Closed, Rejected or Cancelled) nothing can be edited.

Messages that may appear when saving:

Message

What to do

The window end must be after the start.

Fix the dates.

Also enter the window start.

Fill in the start or clear the end.

Related