Board and planning
Choose how the team estimates, how long a sprint lasts and how the board's cards are grouped.
On this page
These settings define how the team plans: which unit it estimates in, how many weeks its sprints last and how the board is arranged by default.
Before you start
You must be the desk's Lead or manage the company's desks.
Steps
Go to Settings → Board.
In Board and planning, choose:
Estimation: Story points or Hours.
Sprint length (Scrum only): from 1 week to 4 weeks.
Board swimlanes: No swimlanes, By person, By priority or By epic.
Press Save.
You see the notice Board settings saved.
What each option changes
Estimation
With Story points, items are estimated in Points and sprints add up points.
With Hours, each item's page shows Estimate (h) and Remaining (h), and the New item form asks for Estimate (hours).
Changing the unit midway doesn't convert the values already entered. Decide before you start estimating.
Sprint length
It is the length proposed when creating a sprint with New sprint. Each sprint can have other dates if you change them when creating or editing it, always between 1 and 4 weeks.
Board swimlanes
They split the board into rows:
By person: one row per assignee, plus Unassigned.
By priority: one row per priority, from P1 to P5.
By epic: one row per epic, plus No epic.
It is the option the board opens with. Each person can choose another one on the board, and their choice is remembered in their browser.
Going to production
The same tab has Going to production, which decides whether releasing a version requires an approved change. See Definition of done and release to production.