DocumentaciónHelp

Board and planning

Choose how the team estimates, how long a sprint lasts and how the board's cards are grouped.

On this page

These settings define how the team plans: which unit it estimates in, how many weeks its sprints last and how the board is arranged by default.

Before you start

  • You must be the desk's Lead or manage the company's desks.

Steps

  1. Go to Settings → Board.

  2. In Board and planning, choose:

    • Estimation: Story points or Hours.

    • Sprint length (Scrum only): from 1 week to 4 weeks.

    • Board swimlanes: No swimlanes, By person, By priority or By epic.

  3. Press Save.

You see the notice Board settings saved.

What each option changes

Estimation

  • With Story points, items are estimated in Points and sprints add up points.

  • With Hours, each item's page shows Estimate (h) and Remaining (h), and the New item form asks for Estimate (hours).

Changing the unit midway doesn't convert the values already entered. Decide before you start estimating.

Sprint length

It is the length proposed when creating a sprint with New sprint. Each sprint can have other dates if you change them when creating or editing it, always between 1 and 4 weeks.

Board swimlanes

They split the board into rows:

  • By person: one row per assignee, plus Unassigned.

  • By priority: one row per priority, from P1 to P5.

  • By epic: one row per epic, plus No epic.

It is the option the board opens with. Each person can choose another one on the board, and their choice is remembered in their browser.

Going to production

The same tab has Going to production, which decides whether releasing a version requires an approved change. See Definition of done and release to production.

Related

Search Elion ITSM

Type at least 2 characters to search Elion ITSM.

↑↓ to navigate · Enter to open · Esc to close