Use the plans board

Follow plans on a board by status, origin or owner, work on their tasks and verify their effectiveness when you close them.

On this page

The Action plans screen shows all the ISMS plans on a Board or in a List. At the top there are four cards:

Card

What it counts

Open

Plans that are open or in progress; below, the total number of plans.

Overdue

Open or in-progress plans whose due date has passed. Clicking it applies Overdue only.

Effectiveness to verify

Closed plans without an effectiveness verification, whose Verify effectiveness on date has arrived or was not set.

Ineffective

Plans verified as ineffective.

Before you start

  • With the Read only role you can see the board, the plan pages and the evidence, but you can't move cards or change anything.

  • To move cards, work on tasks and verify effectiveness, you need the Editor or Administrator role.

Explore the board

  1. Go to ISMS → Action plans and choose Board.

  2. In Group by, choose how to see the columns:

    • Status: To do, In progress and Closed (and Cancelled if you check Show cancelled).

    • Origin: one column per risk, finding, incident, control, requirement, committee decision or manual.

    • Owner: one column per person; those with the most overdue plans come first.

  3. Use the filters to narrow down: Search by code or title…, All origins, All types, All priorities, All owners, Overdue only and Show cancelled. If you came from a standard's panel, the Only plans for one standard tag appears: press it to remove that filter.

Each card shows the code, priority, origin, the SofIA tag if the assistant created it, the linked objects, progress, completed tasks, evidence and due date. Overdue and most urgent items go on top.

The list

With List you see the same plans in a table with the columns Plan (code, title and linked objects), Origin, Type, Owner, Due, Progress and Status. Click a row to open the plan's page.

Change the status by dragging

With the board grouped by Status, drag a card to another column. The change is saved when you drop it and you'll see Status updated. When you drop it in Closed, progress is set to 100% and you'll see PA-… closed. Remember to verify its effectiveness.

When grouped by origin or by owner, cards can't be dragged: open the plan's page to change the status.

Plan tasks

  1. Open the plan and go to the Tasks tab.

  2. Type the task in New task…, choose its owner and its date if applicable, and press Add.

  3. Check a task's box when it is done.

  4. To remove a task, press its trash icon and confirm with Yes, remove. Progress is recalculated with the remaining ones.

With tasks, while the plan is open or in progress, progress is calculated automatically (completed tasks over the total) and the first completed task moves the plan to In progress. Tasks with an owner appear in that person's My work → My tasks. See My tasks.

In a cancelled plan you can't add, check or remove tasks. Reopen it by changing its Status to keep working on them.

Verify effectiveness

Closing a plan isn't enough: you have to check that the action removed the cause and that the problem didn't happen again.

  1. Open a Closed plan and go to the Effectiveness tab.

  2. Choose It was effective or It was not effective and explain how it was checked.

  3. If it wasn't effective, you can check Reopen the plan to keep working on it.

  4. Press Record verification.

You'll see Effectiveness verified: the plan was effective. or Recorded as ineffective. The verification is saved with the date and who did it, and the explanation is added to the Follow-up notes. The card of an ineffective plan shows the Ineffective tag. If you checked Reopen the plan to keep working on it, the plan moves to In progress and keeps the Ineffective tag. However, if you reopen a closed plan by changing its Status in Details, the previous verification is cleared.