Work on the standard's requirements
Review each requirement with the ISMS control that covers it, the coverage and what's missing; record the standard-specific part or exclude it with justification.
The Requirements tab shows the standard's own step-by-step structure (clauses, articles, functions…) in sections. Press a section to open it; next to it you see how many requirements it has.
Read a requirement
Each requirement shows:
Its code and title, and the legal deadline if it has one.
How it is met: Through the ISMS (equivalent mapping), ISMS + specific (partial mapping) or This standard only (no control).
Its status, calculated: the control's if equivalent; the worse of the control and the standard-specific part if partial; its own answer if there's no control.
The ISMS controls that cover it, with the coverage (Equivalent, Partial or Related) and each one's status. Press one to open it in ISMS controls. A control marked outside the ISMS doesn't exist in your ISMS yet.
What's missing (in yellow): controls that aren't compliant and what the standard asks for beyond the control (for example, "the owner must be the DPO").
If it's excluded, Excluded: with its justification; if the standard-specific part is described, Standard-specific:.
Evidence: how many come through controls and how many are the requirement's own, plus its owner and deadline.
Use the filters Status, How it is met (Through the ISMS, ISMS + standard-specific or Only in this standard) and Search (code or title), and press Filter.
Record the standard-specific part or exclude a requirement
You need the Administrator or Editor role.
Press Edit on the requirement.
To exclude it, uncheck The requirement applies to this company and enter the Justification for exclusion (required).
If the requirement is ISMS + specific or This standard only, choose the Status of the standard-specific part (Pending, In progress, Compliant or Critical) and fill in How the gap is covered (or How it is met, if there's no control). Below the field you see what the standard asks for beyond each partial control.
Assign an Owner and Deadline if you want.
Press Save. You'll see Requirement updated. and the standard's compliance is recalculated.
If the requirement is met Through the ISMS, its status isn't edited here: change the control in ISMS controls and the change will show in every standard that requires it.