Create an action plan
Record a plan with its origin, the ISMS objects it relates to, owner, deadline and tasks.
On this page
An action plan is the answer to "what needs to be fixed or implemented". Every plan belongs to the ISMS, not to a standard: it says why it exists (its origin) and which objects it relates to (risks, findings, incidents, controls, standard requirements, assets or committee decisions). This page explains how to create one manually; plans that come from a risk, an incident or a finding are created from those screens.
Before you start
You need the Editor or Administrator role.
To choose an Owner, the person must be registered in the company's staff. See Company.
Steps
Go to ISMS → Action plans.
Press New plan (or Create a plan if there are none yet). New action plan opens on the Details tab.
Type the Title, which is required, and a Description of what needs to be done.
Choose the Origin (why it exists):
Risk, Finding, Incident, Control, Requirement or Committee decision: the plan comes from that object and you'll have to link it.
Manual: it doesn't come from a specific object.
Check the Type. It is suggested based on the origin and you can change it:
Corrective: fixes something that already failed (findings, incidents).
Preventive: prevents something from failing.
Improvement: improves something that already works.
Risk treatment: reduces a risk.
Implementation: implements a control or a requirement.
With origin Committee decision, Improvement is suggested, and with Manual, Corrective.
Choose the Priority, the Status (by default, Open), the Owner, the Progress (%), the Start and the Due date. Owner lists the company's active staff.
If you want, set when to Verify effectiveness on and add Follow-up notes.
Go to the Links tab and add the objects the plan relates to. See Plan links.
Press Create plan.
The Tasks, Evidence and Effectiveness tabs are enabled once the plan is created.
A plan with an origin other than Manual must link the object it comes from: a risk plan says which risk. If it's missing, the window warns you and takes you to Links.
Plan links
On the Links tab, choose the object type (when you choose the origin, the matching type is selected): Risks, Findings, Incidents, Controls, Standard requirements, Assets or Committee decisions.
Type part of the code or name in Search by code or name… and choose the object from the list.
Repeat with all the relevant objects. To remove one, press the x on its tag.
In a new plan, links are saved when it is created; in an existing plan, they are saved immediately.
Edit or cancel a plan
On the board or in the list, click the plan. Its page opens.
Change what you need in Details and press Save.
To void it, press Cancel plan and confirm with Yes, cancel.
Plans are not deleted: a cancelled plan stays in the history and you can reopen it by changing its Status. When you choose the Closed status, progress is set to 100% and the closing date is recorded; if you reopen it later, the closing date and the effectiveness verification are cleared.
If the plan was created by SofIA, its page shows this at the top with the SofIA tag and who authorized it.
What happens next
You'll see Plan PA-0001 created. (with its code); when you save changes to an existing plan, Plan saved. The plan appears on the board in its status column. From its page you can add tasks, Attach evidence to a plan and, when you close it, verify its effectiveness.
Common errors
Situation | What to do |
|---|---|
New plan is disabled | Your role is Read only. |
Create plan isn't enabled | The Title is missing. |
"A plan with origin … must link …" | Link the object it comes from in Links or change the origin to Manual. |
The object you are looking for doesn't appear | Check the type chosen in Links and that the object exists on its screen. |