Configure the risk matrix
Define the size of the ISMS matrix, the likelihood and impact labels, the risk levels and the accepted level.
There is a single risk matrix for the whole ISMS. You define its scale: how many likelihood and impact levels it has, what each one is called, which score ranges each risk level covers and which level your company accepts without treatment.
Before you start
You need the Editor or Administrator role.
A new ISMS starts with a 5 × 5 matrix, levels bajo (low, 1–4), medio (medium, 5–9), alto (high, 10–16) and crítico (critical, 17–25), and accepted level 6.
Steps
Go to ISMS → Risk matrix and press Configure matrix. Configure the risk matrix opens.
Choose the Size (from 3 × 3 to 10 × 10). When you change it, the labels are adjusted to one level per row and the last risk level ends at the new maximum score.
Enter the Accepted risk level: the maximum score the ISMS accepts without treatment.
Adjust the Likelihood labels and Impact labels, one per level.
In Risk levels, review each range: color, name, from and to. Use Add level or the trash icon to change how many there are. Ranges must be contiguous, from 1 to the maximum score (size × size).
Press Save. Cancel closes the window without changes.
What happens next
You'll see Risk matrix updated. Risk levels were recalculated. The inherent and residual levels of all risks are calculated again with the new ranges, and the matrix and its totals are updated.
Common errors
Message | What to do |
|---|---|
Thresholds must be contiguous, with no gaps or overlaps. | Each range must start right after the previous one ends. |
The first threshold must start at 1. / The last threshold must end at … | Set the first "from" to 1 and the last "to" to the maximum score. |
Each threshold must have a different level. | Two ranges have the same name. |
In each threshold, "from" cannot be greater than "to". | Fix the range where "from" ended up above "to". |
The accepted level cannot exceed … | Enter an Accepted risk level within the maximum score. |
There are … risk(s) assessed above …: adjust them before shrinking the matrix. | Some risks use values that would be left out. Edit them first or choose a larger size. |