The risk page
Everything about a risk on one page - affected standards, assessment, treatment and controls, action plans, what it affects and its formal acceptance.
The risk page brings together everything about a risk: which standards it affects, how it is assessed, which controls treat it, which action plans support it, which assets, processes and services it affects, and whether the committee formally accepted it.
Before you start
Any role can view the risk page. To edit, treat or assess the residual you need the Editor or Administrator role.
Open the risk page
Go to ISMS → Risk matrix.
Press the risk's row in the Risks list, or its name in Risks in the cell.
The top shows the code and name, status, inherent and residual levels, treatment and owner. Matrix takes you back to the matrix and Edit opens the risk form. See Register a risk.
Sections
Section | What it shows |
|---|---|
Affected standards | Each adopted standard the risk affects, marked calculated (it comes from its controls: the standard's requirements that correspond to those controls), manual (assigned when editing) or calculated and manual. Press one to see the matrix filtered by that standard. |
Assessment | The inherent and residual risk with their calculation. If the residual can be assessed, its fields and Save residual appear; if not, a notice with a padlock explains what is missing. See Assess the residual risk. |
Treatment and controls | The chosen option and the risk's controls, with their role (Existing or Proposed), their effectiveness and their status in the ISMS. Treat the risk opens the treatment. See Treat a risk. |
Action plans | The linked plans, with status, progress and due date. Go to Action plans opens the board. |
What it affects | Linked assets, processes, services, suppliers, processing activities (RoPA), threats and vulnerabilities. |
Details | Affected dimensions, whether it is a privacy risk, identification and review dates, description and notes. |
Formal acceptance | The committee decision that accepted the risk and the meeting where it was made. |
Manually assigned standards are used while the risk has no controls. As soon as you add controls, standards are calculated automatically; the manually assigned ones are still shown until you remove them when editing.
A risk's formal acceptance is decided by the committee in a meeting; it is not marked from the risk page. When the committee records it, the page shows the decision and the risk changes to Accepted.