View the ISMS and adopted standards
Review the status of the ISMS, its scope and its controls, and the compliance of each standard adopted on top of it.
On this page
Go to Standards → Adopted standards. The screen is called ISMS and standards: at the top it shows your company's ISMS and, below, each adopted standard with its compliance.
Before you start
Any role can view this screen. An auditor whose access was limited to certain standards only sees those.
To edit the ISMS or adopt a standard you need the Administrator or Editor role. With Read only, the Edit and Adopt a standard buttons appear disabled.
The ISMS
Go to Standards → Adopted standards.
In the ISMS box you'll see:
Its status (Being implemented, Operating or Certified), its owner and since when it has been operating.
Scope: the scope text and the areas, processes, services and sites it includes.
How many controls it has (and how many are management system requirements), its average maturity and how many are Compliant, In progress, Critical, Pending and Not applicable. Press a status to see those controls.
The ISMS's single risk matrix (size and accepted level). It's edited in ISMS → Risk matrix.
Press Statement of Applicability to open the one for the whole ISMS.
Press Edit to change its details and scope. See ISMS details and scope.
Adopted standards
Each card shows:
The standard's code and the catalog revision it was adopted with.
Its name and status: Draft, Active, Under audit, Certified or Closed.
Compliance: the percentage with its bar.
How many requirements are Compliant, In progress, Critical and Pending, how many applicable requirements it has and its target.
Press a card to open the standard. If there are none yet, you'll see No standards adopted yet and the Adopt the first one button.
How a standard's compliance is calculated
Only the applicable requirements that apply to your company are considered. Each one contributes according to its status, which is calculated from the ISMS controls that cover it:
Requirement status | Contribution |
|---|---|
Compliant | 100% |
In progress | 50% |
Critical or Pending | 0% |
A requirement excluded with justification (Not applicable) doesn't count. The calculation updates when a control or a requirement changes, or when an assessment is applied.
Adopt another standard
Press Adopt a standard. See Adopt a standard. You can also open ISMS controls and Coverage (the same screen as Standards → Cross-standard coverage) from the buttons at the top.