KPIs and measurements
Record the value of a control's KPI and edit its target, frequency, owner and controls; the measurement counts for every standard.
A KPI measures one or more ISMS controls. Its measurement counts for every standard that requires those controls.
A control's KPIs are in its record: open the control in ISMS → ISMS controls and go to the KPIs tab. Each one shows its status, target, direction, frequency, current value and next measurement.
Before you start
To measure, add, edit or remove KPIs you need the Administrator or Editor role. With Read only you can view the KPIs and their History.
Record a measurement
Press Measure on the KPI. Record measurement opens.
Check the Period: it's suggested based on the frequency (for example
2026-10monthly,2026-T4quarterly,2026-S2half-yearly or2026yearly).Enter the Value and, if you want, a Comment.
Press Record.
The measurement's status is calculated automatically, against the target and tolerance:
Compliant: it reaches the target.
In progress: it doesn't reach it, but it's within the tolerance. If you didn't set a tolerance, 10% of the target is used.
Critical: it's outside the tolerance.
If the KPI has no target, it stays as No data.
Recording the same period again replaces the previous value. The KPI always shows the most recent period, and its next measurement is recalculated using the frequency.
Press History to see previous measurements, with who recorded them and their comment.
When the next measurement is approaching, the KPI appears in its owner's My work → Pending items. From there, the KPI's primary control opens directly.
Add KPIs
Add from catalog: adds the catalog KPIs that measure this control. If they were already there, you'll see The catalog KPIs were already there.
Custom KPI: creates one with Name (required), Formula, Unit, Frequency, Target, Tolerance, Direction (Higher is better or Lower is better), Owner and Next measurement. If you leave the next measurement empty, it's calculated from the frequency. Press Create.
Edit a KPI
Press Edit on the KPI. Edit KPI opens.
Change what you need: Name, Formula, Unit, Frequency, Target, Tolerance, Direction, Owner or Next measurement.
In Controls it measures:
mark the primary control: it's the one that opens from My work and notifications;
add another ISMS control with Add an ISMS control…;
remove one with the X (at least one control must remain).
Press Save.
When you save, the KPI's status is re-evaluated with the last measured value and the new target; previous measurements don't change. If you remove the control you had open, the KPI stops showing in it and appears in the controls you specified.
Remove a KPI
Press Remove on the KPI and confirm with Yes, remove.
If it has no measurements, it's deleted. If it has some, it's deactivated: it's kept with its history, appears dimmed and can no longer be measured.